Data centers built never to go down.
From feasibility study to preventive maintenance, Netis Group designs, builds and urbanizes TIER III–class computer rooms — civil works, power, precision cooling, fire safety and DCIM supervision delivered under a single contract.
One partner, from the concrete slab to the patch panel
A data center is not a stack of independent trades. Power sizing drives the thermal design, the thermal design drives rack urbanization, and the whole must stay supervisable and scalable for a decade. Netis Group owns that entire chain — with no subcontracting on the critical path — so accountability never gets diluted.
Single-source delivery
Civil works, MV/LV power, low-current systems, cooling, security and IT run by one team. One schedule, one acceptance owner, one warranty.
Standards-based design
Architectures aligned with Uptime Institute and TIA-942 requirements: N+1 to 2N redundancy, separated power paths, fault tolerance and concurrent maintainability.
Efficient operation
Free-cooling, aisle containment and DCIM-driven control to lower PUE, contain energy spend and evidence environmental compliance.
Turnkey build-out, every trade included
New builds, extensions and retrofits of live rooms — delivered without service interruption.
Civil works & envelope
- Site survey and floor load analysis
- Fire-rated partitioning and sealing
- Raised technical floor and suspended ceiling
- Interior fit-out and control room
- Design aligned with Uptime Institute TIER III and TIA-942
Power & distribution
- MV/LV transformers and delivery substations
- Diesel generators and backup sequencing
- Redundant UPS and protected distribution
- Busway and protected distribution to every rack
- ATS, intelligent PDUs and per-circuit metering
Precision cooling
- In-Room and In-Row precision units
- Direct and indirect free-cooling
- Redundant chilled-water loops
- Hot or cold aisle containment
Fire detection & suppression
- Very early smoke detection (aspirating)
- NOVEC 1230 clean agent suppression
- FM-200 gas suppression
- Water mist suppression systems
- Smoke extraction and interlocks
Physical security
- Multi-tier access control and biometrics
- IP video surveillance with analytics
- Intrusion detection and anti-passback
- Full access traceability and audit logs
BMS & DCIM supervision
- Centralized building management of utilities
- DCIM: power, thermal and capacity monitoring
- Video wall and operations desk
- Alarms, thresholds and PUE reporting
Structure the space, unlock the performance
Urbanization turns a white space into a manageable resource: PoD-based organization, controlled density, pre-terminated cabling and forward-looking capacity planning.
Architecture & layout
Performance optimization
Resilience & continuity
Automation & orchestration
Compliance & sustainability
Alignment with Uptime Institute and TIA-942, environmental and regulatory compliance, full as-built documentation and operations dossier.
Hosted IT infrastructure
Secured data center networking, SAN/NAS storage with tiering, virtualization and hyperconvergence, backup, replication and multi-site disaster recovery.
Four stages, one commitment to results
A methodology proven on critical infrastructure projects across sensitive sites.
Study & design
Requirements, site constraints and availability targets are analysed, then turned into a tailored architecture sized for growth.
Validation
Proof of concept and full-scale mock-up validating the design in real operating conditions before a single rack is ever ordered.
Build & commission
Civil works, cabling and equipment installation, followed by integration, full load testing, acceptance and a supported go-live.
Operate & support
Guaranteed after-sales service, preventive maintenance and the full enablement of your own in-house data center operations team.
Showcase Of Our Recognized Work
Nine TIER III data centers delivered for port authorities, government bodies and leading banking groups across Morocco.
TIER III Data Center Within a Full Air Base Programme — Benguerir
Central Data Center and Automatic Failover Site — Banque Centrale Populaire
Multi-PoD Urbanization, 170+ Racks — Banque Centrale Populaire Berrechid
120-Rack Data Center Urbanization — DGSN New Headquarters
Three TIER III Server Rooms — ANCFCC
TIER III Data Center Build-Out — Ministry of Foreign Affairs
TIER III Data Center and Operations Center — Direction Générale de la Météorologie
Primary TIER III Data Center — Tanger Med Port Authority
Integrated Innovations
Private trust management
IT Solutions Future
The technologies we integrate
Certified partnerships with leading manufacturers across power, cooling, cabling, security and IT infrastructure.
Planning a data center project?
Let’s talk about your site, your availability requirements and your capacity roadmap. Our engineers come back with a feasibility study and a costed architecture.
Russia
Netherland
Vietnam






